One pull.
No second chance.
On a record-breaking crossing, a long, large-diameter pipeline had to go in within a single pull. Pull force alone would have torn it apart long before it surfaced. So a Prime Pipe Pusher pushed from the far end while the rig pulled — the load shared end to end, the full length in cleanly, in one go.
Watch the story